Response within 24 hours  ·  NDA available  ·  ±0.01mm precision info@ataimeisen.com

CNC Minimum Order Quantity — What’s Reasonable, and Why We Don’t Set One

Minimum order quantities confuse first-time buyers: some shops won’t quote a 50-piece job, others demand 500. Here is what a CNC MOQ actually means, the range you will meet, and why we take orders from a single piece.

No MOQFrom a single piece
24hFree engineer quote
NDABefore file exchange
100%Inspected before ship

What a CNC Minimum Order Quantity Actually Is

A minimum order quantity (MOQ) is the smallest number of parts a shop will accept for a job. It exists because every order carries setup: programming, fixturing, material prep and first-article checks. Shops recover that setup by spreading it across the quantity. The larger the MOQ, the more setup is buried per part.

The MOQs You Will Typically Meet

Across the industry you will see anything from 1 piece (rare, usually prototyping houses) to 50, 100, 500 or more. Many general machine shops quietly decline very small runs because the setup cost makes them unprofitable at low quantity. That leaves first-time buyers — who often only need a few dozen parts or one sample — stranded.

Why We Don’t Set a Minimum

Small orders are not a side activity for us; they are a large part of what we do. Programs usually start as a prototype or a 50–100 piece validation batch and grow into steady monthly volume. Because we schedule flexibly rather than batching only large runs, taking a single piece or a small batch is normal operations, not a favour.

Is a Small Order More Expensive Per Part?

Honestly: the per-piece price is most competitive once quantity climbs into the low hundreds, because setup is spread further. But we do not pad the unit price just because the quantity is low. You get a transparent quote that shows exactly what drives the cost — material, size, tolerance, quantity — so a small run is fairly priced, not penalised.

What Quantity Should You Start With?

If the design is unproven, start with a prototype or a small batch to validate fit and function, then scale. There is no commitment and no minimum, so you are never forced into a larger run than you need. See our small orders and prototypes page for how we handle first-time buyers.

FAQ

Minimum Order Quantity Questions

The questions buyers ask before sending a file — answered from the buyer's side.

What is the minimum order quantity for CNC machining?
There is no minimum order quantity. Prototype runs from a single piece are welcome, and 50–100 pieces is a normal order size for us. Small batches are priced fairly — we don’t pad the unit price just because the quantity is low.
Is there a minimum order for aluminium, steel or titanium?
No. There is no material-based minimum. We machine aluminium, stainless and alloy steel, titanium, brass, copper and engineering plastics in any quantity from one piece upward.
Will a 50-piece order cost more per part than a large run?
The per-piece price is most competitive from low hundreds of pieces because setup is spread further, but we don’t penalise small batches. The quote shows exactly what drives the cost so you can see it is fair.
Can you make just one prototype before production?
Yes. Most programs start as a single prototype or a small validation batch, then move into steady low-volume production once the design is proven.
Do you ship small orders to the USA or Europe?
Yes. We regularly ship small batches to the United States and across Europe by DHL, FedEx and sea freight, with EXW, FOB and DDP terms. Small parcels are economical and we suggest the cheapest viable option.
Why do some CNC shops have high minimums?
Mostly to amortise setup across a larger run. We absorb setup through flexible scheduling instead, so we can take small orders without making them unprofitable for either side.
Can a small order grow into production later?
Yes. The same program, fixtures and DFM feedback carry from first article into recurring monthly batches, so you don’t change suppliers as volume grows.
Share & Cite

Cite this page

Used this in a report or quote justification? A link back helps other engineers find the same reference. Suggested anchor text — reword freely:

<a href="https://www.ataimeisen.com/cnc-minimum-order-quantity-guide.html">CNC Minimum Order Quantity — What’s Reasonable and Why We Have No MOQ — FSCPRECISION</a>
APA
MLA

No permission needed. Please do not rehost the page — link to it instead so the numbers stay current.

Ready to quote a small order?

Send the drawing — even a sketch. A real engineer replies with a priced quote within 24 hours, no obligation.

Get a Free Quote